Dubai Electricity & Water Authority (DEWA) constructs Meydan substation (132/11 kV) located in Wadi Al-Safa (3) on a plot area of around 4,163m2.  

With a built-up area of 4,095m², the substation includes a main building (B+G+1) with a height of 17 metre, in addition to three ancillary buildings for the fire pump, security and earthing transformer.

ECG’s scope involves detailed design, construction supervision and design permits.