The project includes design review of a water transmission line with a length of 42 km, including carbon steel pipes with a diameter of 1000 mm. The line transmits water from a break pressure tank with a capacity of 285,000 m3) to the Mountain Reservoir which has a capacity of 60,000 m3). This adds to 4 booster pump stations; each with a flow rate of 96,000 m3/day.

Scope of works cover preparing the concept design and detailed design master plans for facilitating the construction activities in the logistic zone which comprise the following three areas:

Contractors’ Village

With an estimated area of 760,000 m2; the Contractor’s Village accommodates 24,000 persons and comprise the following:

  • Accommodation buildings with different design features:
    • Type A: Manager Accommodation Buildings (158 bld. x 126 m2 = 19,846 m2)
    • Type B1: Senior Accommodation Buildings (73 bld. x 186 m2 = 13,552 m2)
    • Type B2: Senior Accommodation Buildings (70 bld. x 247 m2 = 17,309 m2)
    • Type C1: Junior Accommodation Buildings (51 bld. x 186 m2 = 18,936 m2)
    • Type C2: Junior Accommodation Buildings (48 bld. x 247 m2 = 23,738 m2)
    • Type D1: Labour Accommodation Buildings (16 bld. x 187 m2 = 5,991 m2)
    • Type D2: Labour Accommodation Building (170 bld. x 280 m2 = 95,353 m2)
  • Mosque with an area of 3,000 m2
  • Central Kitchen with an area of 3,000 m2
  • Sport club with an area of 16,968 m2
  • Utilities with an area of 14,824 m2
  • Internal roads
  • Flood protection channels

Batch Plants’ Area

With an estimated area of 353,198 m2; this area is allocated for installing concrete-batch plants, asphalt-mix plants, and pre-cast concrete facility.

  • The land is divided into sub-plots including:
    • 8 plots for concrete production (each with an area of approximately 15,000 m2)
    • 4 plots for asphalt production (each with an area of approximately 18,000 m2)
    • One plot for pre-cast concrete production facility with an area of approximately 35,000 m2
    • Labs with an area of 3 x 1000 m2
    • Utilities with an area of 11,000 m2
    • Security/guard rooms
    • Flood protection channels
    • Internal roads

Laydown Yard Area

With a total area of 258,591 m2; the laydown yard is divided into sub-plots, including:

  • 13 plots for material laydown & logistics (each with an average area of 10,000 m2)
  • 1 plot for workers camp with an average area of 50,000 m2
  • Utilities with an area of 5,198 m2
  • Fuel depot & concrete mix truck washing facility with a total area of 15,000 m2
  • Security/guard rooms
  • Flood protection channels
  • Internal roads

Activities

  • Architectural
  • Communications and security systems
  • Electrical
  • HVAC
  • Infrastructure
  • Instrumentation
  • Landscaping
  • Mechanical
  • Roads
  • Structural
  • Urban design

Scope

  • Concept Design Master Plan
  • Design review
  • Detailed Design Master Plan
  • Geotechnical Study
  • Hydraulic Studies
  • Master plan
  • Topographic survey

Client

Saudi Arabia

LOCATION

saudi-arabia

,

project sheet

Download File (pdf 711KB)