Studies & Master planning
At ECG, we understand that master planning guides growth and development, and as such is paramount to the future success of all projects. This is why we really give it our all.
Our master planning approach covers urban planning, land-use planning, transportation facilities, open spaces, and public services, as well as environment and heritage conservation precincts; and if this is not enough, we conduct a broad range of other studies pertaining to air, soil, water, health, and safety.
These studies include Economic Impact Analyses, Energy Efficiency Potential Studies, Environmental Impact Assessments, Feasibility Studies, Geotechnical & Ground Engineering Studies, GIS Studies, Hazard & Operability Studies (HAZOP), Hydrologic & Hydraulic Studies, Land Valuations, Marketing Researches, Population Studies, Real Estate & Asset Appraisals, Social Impact Assessments, Solid Waste Management Studies, Traffic Impact Assessments, Urban Development Studies, and water, air, and soil characterizations.
This meticulous attention to detail and comprehensive approach has paid off. Today, we are the trusted name in the field of engineering consultancy both nationally and globally. In addition, we take great pride in that.
see projects relatedGreater Cairo Waterworks Master Plan
The objective of the project is to develop a Master Plan for the phased development of the Greater Cairo waterworks from 1977 through the year 2000.
The Master Plan covered domestic, industrial and irrigation needs of the served areas up to the year 2000, when the population was expected to grow from the present level of over 8 million to about 16 million inhabitants. Accordingly, the consumption was expected to increase from the present level of 2 millions m3 /day to 8 millions m3 /day. The study also included the development of high priority projects to be implemented immediately as remedial measures to improve the present conditions in areas not adequately served by the existing systems. This system consisted of about 2,500 km of mains and branch lines, and several water treatment
plants and pumping stations. The area of the project was largely extended since it covered all suburbs from Helwan in the South to Heliopolis and ElAbour in the North as well as the towns of Giza and Shoubra ElKheima.
The Greater Cairo Waterworks Master Plan study included the following:
- Due to the lack of installed dependable flow measuring equipment, accurate measurement of water flow and pressure at water production facilities and in several areas of the distribution system were carried out by the Consultant using a Cole pitometer. Also,-24 hour flow measurements were made within each distribution network.
- Inspection and evaluation of the condition of existing water meters installed in-house and other connections. Inspection and evaluation of the meter maintenance, repair and calibration. Recommendations to upgrade water metering system were presented.
- A leakage survey program using sonic leak detection equipment in conjunction with metal detectors for locating leaks in pipes, valves & appurtenances. The survey includes about 180 km of mains 400 mm diameter or larger. Measures for reducing leakage were recommended.
- A water wastage survey showed that the water lost without benefit to the consumer after it has been delivered to him because of defective sanitary fixtures represents an appreciable percentage of the daily production.
- Recommendations for a water conservation program were prepared and presented to the Greater Cairo Water Organization.
Southern Africa Trade and Transport Facilitation Project (SATTFP)
The governments of Tanzania and Malawi have observed that delays in crossing the border, cargo clearance, and movement of passengers create barriers to trade in the region. Such delays, which account for the congestions at the Songwe-Kasumulu border crossing, also raise the cost of transportation of goods, which in turn affects the economy of both countries. The governments of Tanzania and Malawi have thus reached an agreement to build a One-Stop Border Post (OSBP) on their common border at the Songwe-Kasumulu crossing.
In collaboration with ECG, the Tanzania Buildings Agency (TBA) will provide consultancy services for the intended OSBP construction and improvement.The timeframe for the execution of this project will be 36
months on two phases.