Engineering Design
What makes us the premier design firm in the MENA region and Sub-Saharan Africa?
The answer comes in one all-encompassing word: Versatility.
Versatility is what allows us to meet the requirements of diverse projects and respond to the needs of different individuals. Versatility is what allows us to innovate and adapt wherever we are in the world. Versatility is also how we always manage to reconcile cost-effectiveness with great quality.
Our extensive range of engineering and design services plays a great role in enhancing this versatility as well:
ECG’s engineering services cover MEP, infrastructure, transportation and process engineering, in conjunction with a range of supplementary engineering services. These include civil and environmental engineering, together with fire protection, lighting, communications, security, and building management systems.
Our design services, on the other hand, cover Front-End Engineering & Design (FEED), Conceptual Design, Preliminary Design, Basis of Design Reports (BODRs), Schematic Design, Design Development, Detailed Design, Design Optimization, Construction Documents, Value Engineering and Computer Simulations.
see projects relatedArchitectural Design
We will admit we are perfectionists. When it comes to architectural design, we want to be innovative, functional, beautiful, environmentally friendly, and above all, we want to leave a legacy for the generations to come. We also want to bring all that to every possible structure. Whether it be a bridge or a highway, an exterior or an interior, we want it to shine.
Although this perfectionism keeps us up all night, it also pays off. We are very proud of our contributions to some of the most prestigious projects in the region: From landmark high-rises and mega residential compounds, to business parks and LEED compliant buildings, and from acoustics and vertical transportation to conveyor systems and much more.
see projects relatedCairo and Giza Water Supply Master Plan
The project serves a total population of 15 million in the cities of Cairo; Giza; new urban communities around Cairo such as Badr, Shorouk, obour, 15 May and new Cairo; rural areas in Giza as well as current and future urban expansions in Greater Cairo and Shobra Elkhema area.
The master plan entails preparing a strategic plan to provide potable water until the year 2037. ECG prepared five-year plans to improve the services of the potable water networks with a view to meeting the increased demand and finding solutions for eliminating the load on the water system infrastructure. The existing system comprises 16 major water production plants with average daily production of 10 million m3/day, 575 ground water
wells, 106 major pump stations, 84 water reservoirs (elevated and ground tanks), 1,800 km of water pipelines with diameters of 300 mm and 1,600 mm.
The project comprises the following stages:-
A) Data Collection and Evaluation Stage: Preparing Preliminary and Final reports. Raw data was collected and sorted in the form of databases and charts in such a way that allows predicting future expectations taking into consideration any possible changes to such data on five-year basis until the target year.
Data collection process was based on approved statistical records of the Central Agency for Public Mobilization and Statistics (CAPMAS), recent versions of urban planning maps approved by the Ministry of housing, utilities and urban Development. The basic information serving design
purposes included the following:
- Cadastral maps and contour maps with large scale layout (showing current and future urban boundary).
- Maps for potable water transmission lines and distribution networks including data on pipelines and their diameters, types and status).
- Maps for other utilities (electricity networks, gas networks, telephone cables, railways, roads, water streams, water sewerage and drainage systems).
- Plans and urban studies including land use, current urban boundary, pivotal urban expansions and squatter areas.
- Demographic studies including population density and growth rates; the impact of population growth on economic and social development on the infrastructure.
- Water Sources: identifying potable water permanent sources such as rivers, lakes and ground water, in addition to the impact of suction rates on water quality, identifying water sources and meeting demand on potable water over the years of the plan.
The preliminary report included a methodological assessment of the current situation; the necessary works to secure water supply systems according to the Egyptian Code and how the produced water complies with the
standard specifications and quality assurance system.
After the preliminary report was approved, the final report was submitted and included development suggestions, estimation of the required works, estimated value and main duration for the implementation of Master Plan over the five-year state plans until the target year.
B) Preparing High-Priority Project (HPP) documents for the coming five years:
Based on the discussion results, approval of both preliminary & final reports and financial budget available to implement projects for the coming five years, proposal documents for integrated works were prepared to
develop and raise the efficiency of potable water stations, distribution networks in order to overcome operation problems and water distribution network problems. This was based on the results of hydraulic analysis of networks using computer programs or similar software as well as results of the water hammer study to conveyor lines in order to secure the service. The required works included:
- General and special conditions
- Technical specifications
- Preliminary drawings
- Bill of Quantities
- Estimated value for required works
C) Preparing Master Plan until the target year 2037:
The Master Plan included submitting studies and analysis of alternatives and giving recommendations on the most appropriate alternative. Also, the annual implementation proposals were submitted for the works in the scope of the Master Plan and expected annual costs estimations.
This was presented in the form of a matrix for the works, recommended implementation durations as well as execution costs in such a way that would form a detailed executive and budget action plan.
The Master Plan was prepared taking into consideration the urban expansions, current & future urban boundary in addition to the expectations of the study over five-year plans (2037-2007).
The Master plan included:
1. Studies on Potable Water Consumption
Studying potable water consumption during the five-year plans until the target year showing the
bases considered to identify population growth rates and consumption rates (domestic, commercial and industrial).
2. Hydraulic Analysis for Future Situation
Based on the results of the hydraulic analysis of the existing situation for water networks and estimations of future consumption rates, hydraulic models were developed in order to:
- Identify available alternatives in order to balance future water demand against current water production capacity.
- Suggest basic options for the development of potable water networks, storage capacities and reservoir locations.
3. Detailed Description of Development Alternatives
A detailed description and design drawings were prepared to develop the following elements along with estimated costs for the alternatives:
- Production sources.
- Potable water distribution networks.
- Pump stations and reservoirs.
4. Economic and Financial Studies
Economic and financial studies included the following:
- Economic costs for alternatives including investment cost for expansion works, support and rehabilitation comprising any costs for land, building, equipment, operation, maintenance and power.
- Comprehensive analysis of investment costs.
- Economic analysis of alternatives showing the adopted approach, cost estimations, interests in addition to technical and economic comparison of alternatives for the Master Plan.
- Identifying the best alternative to develop the service and achieve objectives of the Master Plan.
- Preparing project implementation plan and implementation time schedule over five-year plans until the target year (2037-2007), in addition to allocating the estimated cost of the expected annual works.
- Recommending Annual Expenditure Program.