Project Description
62 Express / Regional Stations:
Development of the first high-speed train network in Egypt. 3 lines 2,000 km:
• Green Line: Ain Sokhna to Marsa Matrouh: 660 km, 23 stations (11 express and 10 regional).
• Blue Line: October Gardens to Aswan: 1,150 km, 36 stations (10 express and 26 regional).
• Red Line: Qena to Safaga: 250 km, 3 stations (2 express and 1 regional).
Full architectural and engineering station design.
Functionality is fundamental to the station planning and defines the station types:
Terminal Stations (G+M+1):
First / last stations, 6 track. Long platforms for extended in-station periods of time. Facilities to serve trains during turn round operations.
• Plaza 20,000 m2.
• External works.
• Landscape.
• Parking.
BUA: 53,000 m2, (typical).
Interchange Stations (G+M+1):
4 / 6 track: LRT, monorail and ENR. Train in-station periods reflect interchange requirements.
• Station Building.
• Commercial Area.
• Platform.
• Internal Plaza.
• Landscaping.
• External Works.
• Parking.
BUA: 50,000 m2.
Plot Area: 1,200,000 m2.
Intermediate Stations (G+M+1)
• Station Building.
• Retail.
• Cafés.
• VIP Lounges.
• Plaza, 10,000 m2.
• External Works.
• Landscaping.
• Parking.
BUA: 15,000 m2.
Activities
- Architectural
- Communications and security systems
- Construction Supervision
- Electrical
- External Infrastructure Networks
- HVAC
- Interior Design
- Landscaping
- Mechanical
- Structural
- Ventilation
Scope
- Concept Design
- Schematic design
- Detailed design
- Construction documents
Client
National Authority for Tunnels
LOCATION
egypt
,project sheet
share this project