Upgrading of Masaieed Town Rps

Project Description

Construction of two 6 MIG reinforced concrete rectangular water reservoirs, including all necessary instruments, piping, electrical, landscaping, and sewer works, in addition to VFD pumps in the existing pump house, standby pump house for existing tanker filling station, and new chlorination building.

Potable Water Pipes

  • 1 km, 600 mm dia. DI pipeline
  • 9 km, 900 mm dia. DI pipeline

Capacity of Potable Water Pumping Station: 43,200 m3/day

Capacity of Potable Water Reservoirs: 12 MIG (2 x 6 MIG)

Capacity of Water Outlet:

  • 2 Duty Mains: 250 l/s
  • Total Flow Rate: 500 l/s

Al Jaber Engineering L.L.C

Completed

Activities

Scope

Detailed Design