Three Troughs Base Slabs, Two Pedestrian Bridges and Temporary Steel Bridge of RA/256 near Jaber Al-Ahmad Al-Sabah Hospital, South Al-Sura Area

Project Description

The project (RA/256) encompasses the construction and maintenance of the section of South Sura area roadways in the vicinity of Jaber Al-Ahmad Al-Sabah hospital, including segments of the 6th ring road and King Fahd Bin Abdul Aziz road.

ECG scope of work covers the following structural design tasks:

  • Base slabs for three troughs, tension piles distribution in the troughs for three zones (M13, M14, and M34) and retaining walls
  • Piles for structures/bridges within all zones
  • Two temporary steel bridges for Zone IC44 over road 40
  • Two pedestrian bridges.

Works covers analysis of the piles required for the five bridges and four utility bridges.

Afcons Infrastructure Limited

Completed

Activities

Scope

Detailed Design