Smart Village Infrastructure
Project Description
Spread over 3 million m2, Smart Village Cairo is Egypt’s first, fully operational information technology cluster and business park. The prime development accommodates multinational and local companies; governmental and financial organizations; educational institutions; and research and development centers. All facilities share sophisticated, state-of-the-art infrastructure; up-to-date facility management; and a full range of business and recreation services.
The project infrastructure networks covered the following components:
- Road Network: four road categories namely Main, access, secondary and local roads are shown as:
- The main roads include the ring road and the roads approaching the project area.
- The secondary and local roads transfer the traffic between the main roads and the different activities.
- The access road is used as an entrance.
The average speed on different road segments is assumed to range between 25 to 45 km/h depending on road class.
- Portable water network: main source of supply is Sheikh Zayed Water Treatment plant network, feeding project area through transmission 300/ 400 mm diameter with length 15 km feeding local storage tanks capacity 36600 m3 facilitated with pump-stations which is feeding the different project buildings through potable water loop network.
- Firefighting Network: main source of supply is the potable water storage tank facilitated with separate fire pumping station which is protecting the different project building internally and externally throughfirefighting loop network.
- Sewage network: Gravity collection system collecting the different peak generated sewage flow from the different building and discharging the final effluent into Abu-Rawash Wastewater Treatment Plant through lift station facilitated with force main pipe line.
- Irrigation Network: main source of supply is Sheikh Zayed Water Treatment plant network, feeding project area with brackish water through transmission 300 200 / mm diameter with length 15 km, in addition to second source Barakat well feeding project area with brackish water through transmission 400 mm diameter with length 9 km feeding local main lagoon, facilitated with pump-stations which is irrigating the different landscape area through irrigation loop network and turf irrigation networks.
- Storm Drainage, collected surface water from different catchments areas including paved roads and parking areas will be collected by gravity through grate inlet Catch Basins and drained into a soak away draining system of the Circular Dry Wall Lined type. Infiltration will be considered through the side walls and open base of the soak away.
- Client
Smart Villages Company, Egypt
- Location
- Sector
- Project Status
Completed