Rod EI Farag Water Filtration Plant Expansion Program
Project Description
Water Treatment Plant:
Construction Cost USD 500 million
USAID funded
Capacity increase: 200,000 to 600,000 m3/day.
Components:
- Nile water intake: 2 No. 175 m, 2,400 mm dia. pipelines.
- Raw water pumping station: 780,000 m3/day (11 m head), 6 No. vertical turbine pumps, 3 No. travelling screens.
- 2 No. Underground storage reservoirs.
- Water clarification and filtration facilities.
- Filtered water pumping station, 1,200,000 m3/ day (60 m head), 8 No. vertical turbine pumps.
- 5 km trunk transmission lines and associated appurtenances to handle the increase in water production.
Services Provided:
Study to determine:
- Most suitable, efficient and cost effective process for treating the River Nile water.
- Most suitable coagulant and coagulant aid dosage
- Optimum surface loading, detection time, rise rate, velocity gradients and other design parameters associated with the treatment process.
Based on:
- Data and laboratory tests.
- Pilot plant investigations to confirm the most economical and effective process for the upgrade of Rod EI Farag south section treatment complex.
- Client
The General Organization for Greater Cairo Water Supply (GOGCWS)
- Location
- Sector
- Project Status
Completed