Parcel R8 Infrastructure

Project Description

Land Area: 2,286 acres

Infrastructure:

  • Combined Potable Water and Firefighting Loop fed from New Capital City Combined Water and Firefighting Network.
  • Smart Water Grid (SWG), based on Automatic Meter Reading (AMR) system.
  • Combined Gravity Sewage and Storm Water Network.
  • Irrigation Water Loop Network fed from the city’s irrigation water system also SWG / AMR.

New Urban Communities Authorities (NUCA)

Completed

Activities

Scope

Data Collection

Concept Design Validation

Preliminary Design

Detailed Design

Construction Documentation (IFC)