Master Plan for Potable Water for Qalyoubia Governorate

Project Description

Potable Water Master Plan (2007 to 2037) for Qalyoubia:

Stage 1: Evaluation and data collection, Geotechnical Information System (GIS), topographic survey and geotechnical investigations, water quality analysis, flow measurement, review of data and previous plans, civilization and population studies, existing and future water consumption studies, and maximum flow rate specification.

Scope:

  • 57 major surface water treatment plants
  • 126 water wells
  • 9 major pump stations
  • 126 water reservoirs (elevated tanks),
  • 3,500 km of pipeline networks, 200 to 1,000 mm dia.

Stage 2: Analysis, studies, final report and bases of design: social, demographic and water demand studies, review and completion of hydraulic studies for the water distribution system and preparation of alternatives with respect to service improvements implemented every 5 years.

Stage 3: Feasibility studies, conceptual designs for water supply systems and preparation of tender documentation (design and build): technical specifications, bills of quantity, drawings. Cost estimate for each tender and construction schedule for high priority projects.

Stage 4: Master Plan Final Report. Viable options and annual construction cost estimates.

Construction Authority for Potable Water and Wastewater

Completed

Activities

Scope

Data Collection

Geotechnical Information System (GIS)

Topographical Survey

Geotechnical Investigation

Water Analysis

Flow Measurement

Feasibility Study

Concept Design

Tender Documentation

Master Plan Report