Lesaffre Egypt Wastewater Treatment Plant
Project Description
Wastewater Treatment Plant:
Five structures: BUA: 5,353 m3, 4,425 m3 of concrete.
- Aeration Tank: 8,400 m3, 7 m high tank, base area 1,360 m², 1,530 m3 of reinforced concrete.
- Up Flow Anaerobic Contact Reactor: 6,343 m3, 12 m high reactor, base area 590 m2, 1,428 m3 of reinforced concrete.
- Equalization Tank: 2,167 m3 tank, base 201 m2, 627 m3 of reinforced concrete.
- Two Clarifiers: 447 m3, base area 1,360 m2, 840 m3 of reinforced concrete.
Location: Al Nubaria Second Industrial City on Cairo Alexandria Desert Road.
- Client
Lesaffre Egypt
- Location
- Sector
- Project Status
Completed
- Share This Project





















