Lesaffre Egypt Wastewater Treatment Plant

Project Description

Wastewater Treatment Plant:

Five structures: BUA: 5,353 m3, 4,425 m3 of concrete.

  • Aeration Tank: 8,400 m3, 7 m high tank, base area 1,360 m², 1,530 m3 of reinforced concrete.
  • Up Flow Anaerobic Contact Reactor: 6,343 m3, 12 m high reactor, base area 590 m2, 1,428 m3 of reinforced concrete.
  • Equalization Tank: 2,167 m3 tank, base 201 m2, 627 m3 of reinforced concrete.
  • Two Clarifiers: 447 m3, base area 1,360 m2, 840 m3 of reinforced concrete.

Location: Al Nubaria Second Industrial City on Cairo Alexandria Desert Road.