King Khaled International Airport Departure Relief Project

Project Description

ECG Engineering Consultants Group served as a subconsultant to NACO Netherlands Airport Consultants. Work covered three terminal buildings, one for domestic flights and two for international flights.

The project’s scope is limited to the departure halls of the three terminals. As the number of departing passengers has increased significantly beyond the current design capacity of the terminals, increased security requirements took place and have led to the implementation of hold baggage screening before check-in. Consequently, congestion and long waiting time for passengers in the departure halls occurred. Therefore, it was decided to redesign/ rearrange all departure procedures areas to relieve the pressure of large numbers of passengers through three measures:

  • in line hold baggage screening (beyond check-in)
  • increase the capacity of check-in counters
  • increase the capacity of passport control as well as security screening.

General Authority of Civil Aviation (GACA)

Completed

Activities

Scope

Concept Design

Preliminary Design

Detailed Design

Tender Documents