KAFD Monorail Project
Project Description
The project comprises the development of a 3.5 km monorail system, including the construction of a viaduct, stations, a depot, and related facilities.
The viaduct features three switch bridges, each with an average span of 24 m and a width of 13 m, designed to accommodate turnouts along the route. Two stations, Station 02 and Station 04, are strategically positioned between P32–P34 and P71–P73, respectively. Station 02 consists of three floors, with a total built-up area of approximately 2,000 m2, while Station 04 comprises two floors with the same total built-up area.
The depot and Operations Control Center (OCC) are integral components of the project, encompassing workshop and administrative areas. The workshop is constructed over two floors, covering an area of 10,000 m2, while the OCC building, housing administrative functions, spans three floors with a total built-up area of 4,200 m2.
- Client
Hassan Allam Saudi Construction Limited CO. (HAC)
- Location
- Sector
- Project Status
Completed