City Gate New Cairo

Project Description

The objective of the project is to construct a new 3-lane road (90 km length and 11.7 m width, Asphalt pavement type) connecting El Sheikh Fadl Village to Ras Gharib City, and to upgrade the existing road and the median in between, including the carriageway, shoulder and verge.

The project encompasses circulation plan, typical U-turns, road marking & signage, pavement layers and street lighting.

Nemesis Contracting PLC

Completed

Activities

Scope

Topographic Survey

Geotechnical Investigation

Detailed Design

Shop Drawings