Cairo International Airport Terminal 2

Project Description

Terminal Building:

Larger terminal and construction of 300,000 m2 airside and landside pavements.

Key Facilities:

  • Baggage handling, 3,000 bags/hour.
  • Early baggage storage.
  • Seven baggage reclaim carrousels.
  • 51 metal detectors / 58 X-ray units.

Components:

  • Airside external work:
  •  
  • Asphalt and concrete hard standings.
  • Potable water, sewerage, firefighting, storm drainage networks.
  • Fuel networks.
  • Electromechanical works for airfield lighting and apron flood lighting.
  • Dry utility networks.
  • Building A (G+4): BUA: 79,000 m2.
  • Building B (G+4): BUA: 102,000 m2.
  • Building C (G+4): BUA: 47,000 m2.
  • 14 contact air gates.
  • 28 passenger boarding bridges.
  • 40 key airside hotel.
  • Landside external works:
  • Potable water, sewerage, firefighting, storm drainage and irrigation networks.
  • Asphalt roads.
  • Car parking, 16,000 m2.
  • Reconstruction of the existing power plant building:
    • Power supply.
    • Connection with the existing Terminal Building 2 power and distribution network through transformers and substations.
    • 3 phase 11 kV, 50 Hz power supply from the existing terminal power plant.

 

Cairo International Airport Terminal Building 2 underwent major expansion, doubling its annual passenger handling capacity to 7.5 million passengers.

The USD 400 million project was financed by the World Bank.

Project Details

BUA: 228,000 m2

Cairo Airport Company (CAC)

Completed

Activities

Scope

Master Plan

Concept Design

Detailed Design

Tender Documents

Tender Services

Construction Management

Construction Supervision