Buraidah Water Network
Project Description
Water Supply Network:
Location: Buraidah, current population 1.26 million.
Objective: Develop and upgrade water networks for 2054 demands.
Scope:
- 289 km transmission mains 400 to 1,200 mm dia.
- 574 km distribution mains 150 to 300 mm dia.
- Two pumping stations: King Fisal 2,000 m3/day and Al Hadya 43,500 m3/day.
- Four Water Treatment Plants: Al Muataa 160,000 m3/day, Al Shamal 100,000 m3/day, Al Shaqa 100,000 m3/day and Al Tawasouaat 80,000 m3/day.
Hydraulics / Review / Master Planning:
- Review and verification of project data.
- Comparison of ground levels / water network the hydraulic analysis.
- Review of population distribution at consumption points in the hydraulic analysis.
- Verify hydraulic analysis and check consumption rates.
- Phase 1: to 2019.
- Phase 2: 2019 to 2034.
- Phase 3: 2034 to 2054.
- Identification of differences in the input data of the study elements.
- Amendments to the project data: reports, drawings and hydraulic analysis.
- Client
Engineering and Technical Services Bureau
- Location
- Sector
- Project Status
Completed