Buraidah Water Network

Project Description

  • Water Supply Network:

    Location: Buraidah, current population 1.26 million.

    Objective: Develop and upgrade water networks for 2054 demands.

    Scope:

    • 289 km transmission mains 400 to 1,200 mm dia.
    • 574 km distribution mains 150 to 300 mm dia.
    • Two pumping stations: King Fisal 2,000 m3/day and Al Hadya 43,500 m3/day.
    • Four Water Treatment Plants: Al Muataa 160,000 m3/day, Al Shamal 100,000 m3/day, Al Shaqa 100,000 m3/day and Al Tawasouaat 80,000 m3/day.

    Hydraulics / Review / Master Planning:

    • Review and verification of project data.
    • Comparison of ground levels / water network the hydraulic analysis.
    • Review of population distribution at consumption points in the hydraulic analysis.
    • Verify hydraulic analysis and check consumption rates.
    • Phase 1: to 2019.
    • Phase 2: 2019 to 2034.
    • Phase 3: 2034 to 2054.
    • Identification of differences in the input data of the study elements.
    • Amendments to the project data: reports, drawings and hydraulic analysis.