Project Description
The project involves the development of the original plans drafted for the terminal building of Bardawil International Airport; the terminal building comprises a basement, mezzanine, and ground floor with a total built-up area of 8,000 m2.
Overall works in the airport cover the construction of 27 buildings and facilities of various built-up areas, along with associated infrastructure and landscaping works:
- Terminal building (bua 8,000 m2)
- Administration building (bua 720 m2)
- Air traffic control tower (bua 1,500 m2)
- Airport maintenance building (bua 340 m2)
- Airport waste building (bua 107 m2)
- Electric substation building 1 (bua 115 m2)
- Electric substation building 2 (bua 480 m2)
- Primary airfield lighting building (bua 220 m2)
- Secondary airfield lighting building (bua 480 m2)
- Firefighting building (bua 833 m2)
- Power station building (bua 220 m2)
- Chiller yard (bua 350 m2)
- Chlorination room (bua 6 m2)
- Water tank (bua 525 m2)
- Meteorology building (bua 110 m2)
- Weapons storehouse (bua 114 m2)
- Warehouse/ office building (bua 120 m2)
- Security building (bua 40 m2)
- Guard house (bua 17 m2)
- Airside guard house (bua 134 m2)
- Permissions building (bua 106 m2)
- Housing facility (bua 634 m2)
- Soldiers’ mess (bua 316 m2)
- Bathrooms facility (bua 55 m2)
- Employees’ motel (bua 920 m2)
- Parking building (bua 375 m2)
- Mosque (bua 780 m2)
- Client
Armed Forces Engineering Authority
Egyptian Ministry of Defense & Military Production
- Location
- Sector
- Project Status
Completed
- Share This Project