Project Description

The project involves the development of the original plans drafted for the terminal building of Bardawil International Airport; the terminal building comprises a basement, mezzanine, and ground floor with a total built-up area of 8,000 m2.

Overall works in the airport cover the construction of 27 buildings and facilities of various built-up areas, along with associated infrastructure and landscaping works:

  • Terminal building (bua 8,000 m2)
  • Administration building (bua 720 m2)
  • Air traffic control tower (bua 1,500 m2)
  • Airport maintenance building (bua 340 m2)
  • Airport waste building (bua 107 m2)
  • Electric substation building 1 (bua 115 m2)
  • Electric substation building 2 (bua 480 m2)
  • Primary airfield lighting building (bua 220 m2)
  • Secondary airfield lighting building (bua 480 m2)
  • Firefighting building (bua 833 m2)
  • Power station building (bua 220 m2)
  • Chiller yard (bua 350 m2)
  • Chlorination room (bua 6 m2)
  • Water tank (bua 525 m2)
  • Meteorology building (bua 110 m2)
  • Weapons storehouse (bua 114 m2)
  • Warehouse/ office building (bua 120 m2)
  • Security building (bua 40 m2)
  • Guard house (bua 17 m2)
  • Airside guard house (bua 134 m2)
  • Permissions building (bua 106 m2)
  • Housing facility (bua 634 m2)
  • Soldiers’ mess (bua 316 m2)
  • Bathrooms facility (bua 55 m2)
  • Employees’ motel (bua 920 m2)
  • Parking building (bua 375 m2)
  • Mosque (bua 780 m2)

Armed Forces Engineering Authority
Egyptian Ministry of Defense & Military Production

Completed

Activities

Scope

Design Review

Schematic Design

Detailed Design

Construction Supervision