Alexandria West Wastewater Treatment Plant
Project Description
Upgrade of Wastewater Treatment Plant:
Capacity: 186,000 m3/day.
Components:
- New influent pumping station: 955,000 m3/day, 54 m dia. Circular slurry wall installed for construction.
- New headworks.
- New primary clarifiers.
- New sludge blending pumping station.
- New primary sludge pumps, scum pumps and W2 water pumps with hydro-pneumatic tanks.
- New staff housing.
- Modifications of the existing building to house W2 water pumps and blowers.
- Modifications of existing buildings to serve as workshop and storage facility.
- Modifications of existing grit tanks to serve as W2 storage reservoir.
- Yard piping: 200 to 2750 mm dia.
Services Provided:
- Survey and studies.
- Preliminary and detailed designs.
- Tender documentation.
- Cost estimates.
- Advising and assisting AGOSD in evaluating tenders and awarding equipment and construction contracts.
- Construction management and supervision services, construction phase.
- Training AGOSD personnel in Operation and Maintenance (O&M).
- Preparing O&M Manuals.
- Assisting in starting up and initial operation of the project.
- Client
Alexandria General Organization for Sanitary Drainage (AGOSD)/ USAID
- Location
- Sector
- Project Status
Completed
- Share This Project