Alexandria West Wastewater Treatment Plant

Project Description

Upgrade of Wastewater Treatment Plant:

Capacity: 186,000 m3/day.

Components:

  • New influent pumping station: 955,000 m3/day, 54 m dia. Circular slurry wall installed for construction.
  • New headworks.
  • New primary clarifiers.
  • New sludge blending pumping station.
  • New primary sludge pumps, scum pumps and W2 water pumps with hydro-pneumatic tanks.
  • New staff housing.
  • Modifications of the existing building to house W2 water pumps and blowers.
  • Modifications of existing buildings to serve as workshop and storage facility.
  • Modifications of existing grit tanks to serve as W2 storage reservoir.
  • Yard piping: 200 to 2750 mm dia.

Services Provided:

  • Survey and studies.
  • Preliminary and detailed designs.
  • Tender documentation.
  • Cost estimates.
  • Advising and assisting AGOSD in evaluating tenders and awarding equipment and construction contracts.
  • Construction management and supervision services, construction phase.
  • Training AGOSD personnel in Operation and Maintenance (O&M).
  • Preparing O&M Manuals.
  • Assisting in starting up and initial operation of the project.

Alexandria General Organization for Sanitary Drainage (AGOSD)/ USAID

Completed

Activities

Scope

Design Review

Tender Evaluation

Construction Management

Construction Supervision

Training

O&M Manuals

Start-up and Operation