Project Description

Engineering Consultants Group worked on this project in a joint venture with Euroconsult, which involved reviewing preliminary design (PD) documents and preparing final designs and tender documents for the following components:

  • Pavements and visual aids for the new Runway 09-27.
  • Airfield lighting and electrical enabling works.
  • Electrical diversion works.
  • Airfield lighting systems for the new Runway 09-27 and associated taxiways, including related civil and power supply installations.
  • Airfield lighting substations.
  • LV power supply to non-visual navigational aids.
  • Street lighting network for the airport’s perimeter roads.
  • Telecom and ELV infrastructure and connection with existing systems at the project limit of work.
  • NAVAIDS and MET equipment for Runways 09-27, 10-28.
  • Drainage, including designing the structures (5 culverts) between the runways and the pond, as well as a sleeve for crossing the taxiway, and a 2-box culvert for crossing the main runway leading to the pond.
  • Sleeves for the firefighting system crossing the new runway and taxiways.

Al-Kawthar National Contracting & General Trading Co.

Completed

Activities

Scope

Design Review (for concept design documents)

Schematic Design

Detailed Design

Tender Documents