Al-Mahmoudeya Power Plant

Project Description

Elsewedy Power System Projects (PSP), a subsidiary of Elsewedy Electric, was awarded an Engineering, Procurement, and Construction (EPC) contract for Mahmoudia Gas Turbine Power Plant. Understanding the urgency of implementing such a national high-priority project within the predetermined time constraint, ECG has rapidly set up a task force involving senior staff to plan and meet the project’s staffing requirements and to immediately start the mobilization of personnel specifically appointed to meet PSP milestones. This has enabled a quick start of construction, and has allowed for a timely execution of the PSP Construction Scheme.

The simple cycle power plant in Mahmoudia has 2 × AE94.2 Ansaldo Gas Turbines with a total rated capacity of 330 MW.

The project also covers the installation of equipment and units such as transformers; GIS; gas-receiving system and networks; administrative and control buildings; as well as workshops and site utilities (compressed-air system, industrial wastewater system, sewage treatment system, tanks, demineralized water system, stormwater drainage, and low-current systems).

Elsewedy Power System Projects (PSP)

Completed

Activities

Scope

Design Review

Construction Supervision