10-Year Master Plan & Maintenance Management Plan for Roads in Dukhan Fields

Project Description

Qatar Petroleum (QP) entrusted ECG Engineering Consultants Group with developing the 10-year master plan and maintenance management plan for roads in Dukhan fields. The project site is located at approximately 80 km west of Doha with 65 km long and 12 km wide. Dukhan Fields approximately covers 767 km2 and comprises oil and gas facilities along with supporting services and infrastructure.

The project included three main stages:

  • Conceptual Design: producing Site Survey Report containing all information gathered.
  • Preliminary Design: drafting the 10-year Master Plan of Dukhan Fields Roads Development and Roads Maintenance Management Plan.
  • Detailed Design: developing a final copy of the 10-year Master Plan of Dukhan Road Networks and Roads Maintenance Management Plan.
     

Qatar Petroleum

Completed

Scope

Traffic Surveys

Data Collection

New QP Facility Routes & Lighting; Optimizing Existing 317 km-Roads, Roundabout Design & Signs & Existing Road Lighting

Development of Inspection Plan

Development of Road Condition Classifications Scheme

Development of Road Risk Assessment Procedure

Drainage Maintenance

Illumination Maintenance

Development of Emergency Maintenance Plan

Recommendation of Equipment/ Tools and Software Programs for Sustainable Road Maintenance Activities

Reviewing Storm Water Drainage of Existing Roads

Road Surface & Roadside Maintenance Activities

Structure Maintenance Activities

Traffic Maintenance Activities

Cost Estimation