10-Year Master Plan & Maintenance Management Plan for Roads in Dukhan Fields
Project Description
Qatar Petroleum (QP) entrusted ECG Engineering Consultants Group with developing the 10-year master plan and maintenance management plan for roads in Dukhan fields. The project site is located at approximately 80 km west of Doha with 65 km long and 12 km wide. Dukhan Fields approximately covers 767 km2 and comprises oil and gas facilities along with supporting services and infrastructure.
The project included three main stages:
- Conceptual Design: producing Site Survey Report containing all information gathered.
- Preliminary Design: drafting the 10-year Master Plan of Dukhan Fields Roads Development and Roads Maintenance Management Plan.
- Detailed Design: developing a final copy of the 10-year Master Plan of Dukhan Road Networks and Roads Maintenance Management Plan.
- Client
Qatar Petroleum
- Location
- Sector
- Project Status
Completed
- Share This Project
























