Client:

Ministry of Local Administration and Environment, Syria

Location:

Adra Industrial Zone, Syria

Tannery Wastewater Treatment Plant

Capacity 11,000 cubic meter / day
 
<< Back
Print this case study

Funded by the United Nations Industrial Development Organization and the Islamic Development Bank, Saudi Arabia, the Tannery Wastewater treatment Plant entertained a total production capacity of 11,000 m3/day suitable for industrial purposes. ECG designs secured compliance with Syrian environmental laws and adopted a recycling strategy for the recovery and reuse of chrome in the industrial tanning process. Engaged the preparation of topographic, geotechnical, and soil mechanical studies; detailed designs; and tender documents; ECG also undertook tender evaluation and construction supervision responsibilities.

Scope

  • Studies
  • Tender action
  • Construction supervision

Types of activities

  • Civil works

Click on thumbnail to change image.
Click on large image to view it at full resolution.

by DMICreative

Printed from the ECG website

Page: Projects > Water and Wastewater > Tannery Wastewater Treatment Plant
URL: http://www.ecgsa.com/tannerywastewatertreatmentplant