Client:

Qatar Petroleum (QP)

Location:

Doha, Qatar

Phase 2 Of New Natural Gas Liquid (NGL) Support Campus At Mesaieed

LAND AREA 330,383 Square meter
 
<< Back
Print this case study

Qatar Petroleum Gas Operations in Mesaieed lies 45 km south of Doha, Qatar. The operations are currently located around 2 km north-west of the existing Natural Gas Liquid (NGL) Complex.

The New NGL Support Campus is being developed on a 330,383 m2 area, located at south west of Masaieed Industrial City along Sea line Road. The Campus consists of an L-shaped strip of land, partially wrapping an existing sand dune along its southern and southern eastern side.

The project comprises eight zones; two of which are combined to form the administration/canteen complex. The project buildings are designed for maximum utilization of the built-up areas and are annexed to phase 1 buildings to maintain the overall characteristics of NGL Campus. Each area is serviced by separate parking space.

LABORATORY BUILDING - NGLC16

The laboratory building is designed to reflect an image of hygiene and cleanness accommodating the labs at the ground floor and the offices & staff facilities at the first floor. The building facades will match the overall theme of the NGL Support Campus.

ADMINISTRATION AND CANTEEN BUILDING - NGLC17

The complex consists of two buildings: Administration with capacity of 300 employees and Canteen with 350-seat hall, in addition to 200-car parking spaces. The building presents a group of engineering solutions and efficient zoning.

MOSQUE BUILDING - NGLC19

The mosque building represents a unique function in the campus that serves the worshipers for day prayers. The building includes ablution and toilet facilities. Male/Female prayer areas are separated with two different entrances from sides of the building.

CENTRAL WORKSHOP - NGLC20

The new central workshop is designed to accommodate the operational requirements and future needs. Smooth operation is allowed for maximum efficiency to fulfill the end-user operation requirements.

WAREHOUSE AND STORES- NGLC21

This area comprises five buildings: the main warehouse building, the chemical store, the sorting shed, the open sided shed and the gas cylinders storage shed, in addition to a laydown yard with an area of 12,000 m2. Building heights allow for maximum volume utilization, widths allow for smooth circulation of forklifts and buildings' locations allow for easy interconnectivity between the different storage areas.

Transport Depot & Fuel Vending Facility - NGLCTD

This area comprises three buildings: administration building, storage building, vehicle service workshop and gas station shed as well as shed covering large vehicles parking area. The parking spaces allocated to employees are located at the parameter of the zone, while the road crossing the plot is used for car-in-service movement.

SHUTDOWN & WASH DOWN YARD - NGLCWA

This area comprises two buildings: the maintenance building and the outdoor shutdown wash yard. The parking spaces allocated to the employees are located at the parameter of the zone, while the road crossing the plot is used for trucks-in-service movement.

Scope

  • Concept design
  • Preliminary design
  • Detailed design
  • Tender documents
  • BOQ

Types of activities

  • Architecture
  • Civil works
  • Communication & Security
  • Electrical
  • Fire protection
  • HVAC
  • Internal & external signage
  • Irrigation
  • Interior design
  • Landscape
  • Life Safety
  • Mechanical
  • Structural

Click on thumbnail to change image.
Click on large image to view it at full resolution.

by DMICreative

Printed from the ECG website

Page: Projects > Urban Development and Mixed-Use > Phase 2 Of New Natural Gas Liquid (NGL) Support Campus At Mesaieed
URL: http://www.ecgsa.com/phase2ofnewnaturalgasliquidnglsupportcampusatmesai