News

Manateq Headquarters in Ras Bufontas, Doha, Qatar

Manateq Headquarters at Qatar Economic Zone 1 (QEZ-1) is set to play a major role in the development of the economic zone and Ras Bufontas area at large. With a built-up area of
35,000 m2, the building consists of four wings interconnected by pedestrian bridges. Each wing consists of a ground floor, four upper floors, and a roof.

An external area surrounding the wings features piazzas, gardens, ramps, surface car parks, and a drop-off. A technical yard is located in an adjacent parcel owned by Manateq. The yard provides electric power and chilled water to the building to keep it fully operational until QEZ-1 infrastructure networks are in service.

ECG’s scope of work covers design review, schematic design, and detailed design.

by DMICreative

Printed from the ECG website

Page: Media > Press Release
URL: http://www.ecgsa.com/manateqheadquartersinrasbufontasdohaqatar1