Client:

National Water and Sanitation Authority (NWSA), Sanaa

Location:

Al-Mukalla, Yemen

Improving the Effeciecy of Al-Mukallah Water Supply System

PROJECT GOAL Provide adequate water at minimum cost
 
<< Back
Print this case study

The project main objective is to build-up Al-Mukalla Branch of NWSA into an efficiently and effectively operating system that can provide adequate water at minimum cost to all potential consumers. A secondary objective is to prepare a feasibility study and a master plan for the replacement and/or strengthening of the existing distribution system.

Scope

  • Update the existing water distribution system drawings.

  • Implement a leak detection program.

  • Develop a computerized mathematical model for simulating network flows and perform pipe network analysis.

  • Train NWSA personnel on the use of leak detection equipment and computer software (Pipe network analysis, CADD, Lotus, WordPerfect, d.BASE).

  • Review all existing documentation related to land-use, population, weather conditions, etc.

  • Prepare the Master Plan for Al-Mukalla Water Supply System and recommend the required network rehabilitation and reinforcement implementation program.

Types of activities


Click on thumbnail to change image.
Click on large image to view it at full resolution.

by DMICreative

Printed from the ECG website

Page: Projects > Water and Wastewater > Improving the Effeciecy of Al-Mukallah Water Supply System
URL: http://www.ecgsa.com/improvingtheeffeciecyofalmukallahwatersupplysystem