Client:

Egyptian Airports Company (EAC)

Location:

Cairo, Egypt

Egyptair Temporary Facilities at Terminal Building 3

FOOTPRINT AREA 5,500 Square meters
 
<< Back
Print this case study

The construction of Temporary facilities buildings to directly serve the airside. With a footprint area of 5,500 m2 the project comprise 3 buildings, maintenance and engineering building which include offices, lockers area and common services area; cargo and catering building which include administration offices, assembly area for catering and storage and ground services equipment building which include waiting areas.

Scope

  • Geotechnical investigation
  • Master plan
  • Concept design
  • Detailed design
  • Tender documents
  • Tender action
  • Construction management
  • Construction supervision

Types of activities

  • Architectural
  • Civil works (water supply, wastewater, storm water drainage, and irrigation system)
  • Communications and security systems
  • Electrical
  • HVAC
  • Mechanical
  • Roads
  • Structural

Click on thumbnail to change image.
Click on large image to view it at full resolution.

by DMICreative

Printed from the ECG website

Page: Sectors > Transport > Aviation > Egyptair Temporary Facilities at Terminal Building 3
URL: http://www.ecgsa.com/egyptairtemporaryfacilitiesatterminalbuilding3