Client:

Cairo Airport Company

Location:

Cairo, Egypt

Cairo International Airport Seasonal Flights Terminal Building

TERMINALS CAPACITY 2.5 mn passengers/year
 
<< Back
Print this case study

A new Terminal Building is designated for seasonal flights e.g. Hajj, Omrah and group travels, to act as an annex to Terminal Building No.3 in Cairo International Airport. The terminal building footprint is about 16,000 m2. An area of 12,000 m2 is totally enclosed and air-conditioned whereas the remaining area of 4,000 m2 is comprising a shaded outdoor plaza. In addition, two adjacent facility buildings are designated for providing services to passengers. Also, chiller plant and electric substation are provided. Works also include landscape works, roads and car parking. The building shall serve 2.5 million passengers per year.

Scope

  • Geotechnical investigation
  • Master plan
  • Concept design
  • Detailed design
  • Tender documents
  • Tender action
  • Construction management
  • Construction supervision

Types of activities

  • Architectural
  • Civil works (water supply, wastewater, storm water drainage, and irrigation system)
  • Communications and security systems
  • Electrical
  • Fire protection
  • HVAC
  • Landscape
  • Mechanical
  • Roads
  • Structural

Click on thumbnail to change image.
Click on large image to view it at full resolution.

by DMICreative

Printed from the ECG website

Page: Sectors > Transport > Aviation > Cairo International Airport Seasonal Flights Terminal Building
URL: http://www.ecgsa.com/cairointernationalairportseasonalflightsterminalbu