Kharafi National (KN) has been awarded the Engineering, Procurement and Construction (EPC) contract of Egypt Al-Shabab Gas Turbine Generating Plant (GTGP). ECG was invited by KN to provide the engineering design services in support to their EPC contract.
The first gas turbine unit is planned to start commercial operation on June, 2011 for Al-Shabab GTGP. Subsequently, ECG has set its fast track methodology to fully complete the design services in a period satisfying KN proposed schedule requirements.
The new plant shall have eight new gas turbines with a total rated capacity of 1000 MW using 8*125 MW gas turbines.
Understanding the importance, sensitivity and urgency for implementing the plant within the time constrain being a national "on spot" project, ECG has quickly set a task force from its senior staff to plan and set the project staffing requirements and the immediate mobilization of task forces, fast-track quality control measures, and packaging of deliverables which are tailored to meet KN milestones, enable the quick start of construction and allow for a continuous flow of KN construction execution scheme.
ECG Scope of services covers the following:
Package 1: Enabling Work
Package 2: Foundation Package
Package 3: Tank farm design
Package 4: Auxiliary Systems (service water system, compressed air system, solar fuel system, fire fighting system, GIS substation, control s/s, LV transformer, control building, etc)
Package 5: Infrastructure Networks
Package 6: Ancillary Buildings
![]() |
![]() |
![]() |