To serve the city of Fujairah and its environs, a wastewater collection and treatment system was developed.
The wastewater collection network comprised 120 km of sewer pipes, 16 pumping stations, and 11 km of wastewater transmission mains connecting pump station no. 1 to the wastewater treatment plant. Meanwhile, 4.6 km of effluent transmission mains joined the wastewater treatment plant to the Mirbah Dam.
The implementation program was divided into two phases. Phase I involved the completion of the western and central parts of the wastewater collection network, pumping station no. 1, the wastewater pressure main (connecting pump station no. 1 to the wastewater treatment plant), the effluent pressure main running to the Mirbah Dam, and the outlet structure at the Mirbah Dam. In phase II, the remaining coastal strip connections of the wastewater collection network were concluded.
![]() |
![]() |